Wella Climazon: Millenium Manual Install

Wall installation requires the (WA04) wall arm or similar approved support. Phase A: Fixing the Wall Bracket

Align the mounting bracket and mark the drill holes. Insert heavy-duty wall anchors and secure the bracket with the provided high-tensile screws. Phase B: Attaching the Arm and Head

The (often referred to in technical documentation alongside the Climazon²) is a cornerstone of professional salon equipment, offering precision infrared heating for coloring, perming, and drying treatments. Proper installation is critical to ensure both the safety of your clients and the longevity of the device. wella climazon millenium manual install

Ensure the area allows for the movement of the side heating arms, which are adjustable and foldable. 2. Pedestal (Mobile) Installation: Step-by-Step The mobile version typically utilizes the ST5 Pedestal . Phase A: Assembling the Base

Unscrew the extension locking screw from the pedestal tube. Warning: The internal spring may cause the tube to extend slowly; ensure no people or objects are directly in front of it. Wall installation requires the (WA04) wall arm or

Use the brake screws on the arm to adjust the swivel resistance and the internal tension screw to balance the vertical movement based on the head's weight. 4. Technical Maintenance and Resources

Never use the Climazon Millenium with older Wella pedestals (such as type ST3), as the device may fall and cause injury. Phase B: Attaching the Arm and Head The

Lift the Climazon head and align its mounting point with the top of the pedestal tube.

Push the three swivel castors into the pre-drilled holes on the underside of the pedestal base until they click into place. Ensure they are secure to prevent the unit from tipping.

Slide the Climazon head onto the pin at the end of the spring arm. Ensure the safety screw or locking pin is fully engaged to prevent accidental detachment.